Friday May 18, 2012
Lucas/Wood County
Fulton/Henry/Williams County
Ottawa/Sandusky/Seneca County
District Wide
1. Interstate 75/475: Interchange Upgrade *UPDATED*
Lucas County (281-10): Upgrade the I-75/I-475 interchange, widen I-475 from Rushland Avenue to I-75 and construct a new interchange at ProMedica Parkway.
INTERSTATE RESTRICTIONS
Through 2012, the right lane in both directions of I-475, between Monroe Street and I-75, is restricted. Additional lane restrictions are possible, overnight from 7pm to 6am, on I-475 in both directions from Rushland Avenue to I-75 and on I-75 in both directions from Detroit Avenue to Berdan Avenue.
RAMP RESTRICTIONS
CITY STREET TRAFFIC
Project complete: Fall 2013. All work is weather permitting.
2. Interstate 75: Resurfacing & Slope Repair *UPDATE*
Wood County (590-11): Though September, expect lane and ramp restrictions in both directions of I-75, between South Avenue and I-75/475 split in Perrysburg. I-75 may be reduced to one lane overnight from 8pm until 6am. Slope repair on southbound I-75, between Miami Street and Wales Road, is now complete.
RAMP CLOSURES:
Tonight through Saturday, May 19, overnight from 8pm through 6am, expect short-term, alternating closures of the ramps to/from southbound I-75 to/from Miami Street (Exits 199B & 199A) and Wales Road (Exit198) for paving.
On Saturday, May 19 at 8pm thought Sunday, May 20 at 6am, expect short-term, alternating closures of the ramps to/from northbound I-75 to/from Wales Road (Exit 198) and Miami Street (Exit 199) for paving.
Project complete: September 2012. All work is weather permitting.
3. Interstate 475: Maumee River Bridge
Lucas & Wood Counties (90-11): Through July, both directions of I-475, between SR 65 and U.S. 24, are reduced to one lane for bridge work. Through July, the ramps from eastbound and westbound US 24 to southbound I-475 are closed. Detour: northbound I-475; Salisbury Road/Dussel Drive (Exit 6). Project complete: November 2012. All work is weather permitting.
4. Interstate 280: Bridge Painting
Wood County (613-11): Through August, I-280 in both directions, between Woodville Road and SR 795, is reduced to one lane for bridge painting. Project complete: August. All work is weather permitting.
5. U.S. Route: 24: Barrier Wall Installation *NEW PROJECT*
Lucas County (213-12): Effective Tuesday, May 29 through August, both directions of US 24, between Fallen Timbers Lane and I-475, will be reduced to one lane for barrier wall installation. Project Complete: September. All work is weather permitting.
6. U.S. Route 24: New Highway Construction
Lucas & Henry Counties (8015-09 & 201-09): Construction of a newly aligned four-lane divided highway from U.S. 24 Waterville to Napoleon. Motorists may encounter construction vehicles working near the new alignment throughout the project. Through September, U.S. 24, between Dutch Road and Fallen Timbers Lane, is reduced to one lane in both directions. Through September, US 24, between Henry TR-10 and SR 424 will be reduced to one lane in both directions for tie-in work.
The following roads are closed for overpass construction:
The entire new U.S. 24 alignment, from Waterville to Napoleon, is scheduled to open to traffic in September 2012. Project complete: May 2013. All work is weather permitting.
7. U.S. Route 20: Drainage Work *NEW WORK*
Wood County: Effective Monday, May 21, through Friday, May 25, from 7am to 4pm, lane restrictions are possible on eastbound US 20 at US 23 for drainage repair. All work is weather permitting.
8. State Route 25: BG N. Main Street Widening Project
Wood County (136-11): Through summer of 2012, N. Main Street (SR 25), between Dill Street and Newton Road, is reduced to one lane in both directions with a designated center left-turn lane for utility work. Through summer of 2012, intermittent lane restrictions are possible in both directions of N. Main Street (SR 25) at Poe Road, for intersection work.
Through July, westbound Poe Road, from Prospect Street to Main Street is closed. Detour: North College Drive; Newton Road; Fairview Avenue. Eastbound traffic will be maintained.
Access to all businesses will be maintained. Project complete: August 2013. All work is weather permitting.
9. State Route 795: Resurfacing & Bridge Work
Wood County (637-11): Effective Tuesday, June 5, through Tuesday, June 19, SR 795 between Fostoria Road and Pemberville Road will be closed for bridge repair. Detour: I-280; SR 51. Project complete: September 2012. All work is weather permitting.
10. State Route 281: Resurfacing & Bridge Work
Wood County (637-11): Through June, intermittent lane restrictions are possible on SR 281, between SR 199 and US 6, for resurfacing. Traffic will be maintained by flaggers. Project complete: September 2012. All work is weather permitting.
11. State Route 163: Culvert Replacement
Wood County: Through Monday, May 21, SR 163 at Lemoyne Road is closed for culvert replacement. Detour: US 20; SR 420. All work is weather permitting.
12. U.S. Route 20: Resurfacing
Williams County (188-12): Through July, intermittent lane restrictions are possible on US 20 between SR 576 and US 20A for resurfacing. Traffic will be maintained by flaggers. Project complete: July. All work is weather permitting.
13. State Route 34 & 49: Resurfacing
Williams County (48-12): Through October, intermittent lane restrictions are possible on SR 34 between the Ohio/Indiana border and SR 49 and on SR 34 east and west of Bryan for resurfacing. Additionally at this time, lane restrictions are possible on SR 49, from SR 34 to US 20. Traffic will be maintained by flaggers. Project complete: October. All work is weather permitting.
14. State Route 49: Bridge Replacement *UPDATE*
Williams County (115-12): Through June, intermittent lane restrictions are possible on SR 49 on the bridge over Fish Creek, between Stadium Street and CR D for bridge work. Traffic will be maintained by flaggers.
Effective Monday, June 4, through August, SR 49, between Stadium Street and CR D will be closed for bridge replacement. Detour: US 6; SR 576; SR 34. Additionally, at this time, CR-C60 at SR-49 will be closed. Local access will be maintained. All work is weather permitting.
15. State Route 120: Resurfacing & Bridge Maintenance
Fulton County (522-11): Through June, SR 120, between CR 10 and SR 109, is closed for bridge repair. Detour: SR 109; US 20; CR 10-3. Resurfacing work on SR 120 from the Village of Lyons to CR 7 will occur following the closure. Project complete: September. All work is weather permitting.
16. Hallett Avenue: Railroad Grade Separation
Fulton & Lucas Counties (1069-10): Through November 2012, Hallett Avenue, between Church Street and Garfield Avenue, is closed for construction of the overpass. Detour: Airport Highway; SR 64; Shaffer Road (CR J). Project complete: Summer 2013. All work is weather permitting.
17. U.S. Route 20: Pavement Rehabilitation
Sandusky (3003-11): Through November, lane restrictions are possible on US 20 between CR 32 and State Street in Fremont for pavement rehabilitation. Project complete: December. All work is weather permitting.
18. State Route 53/163: Intersection Upgrade and Resurfacing
Ottawa County (278-11): Through May, expect lane restrictions at the intersection of SR 53 and SR 163 for intersection upgrade. Access to businesses will be maintained. Project complete: June. All work is weather permitting.
19. State Route 163: Resurfacing
Ottawa County (128-11): Through May 23, intermittent lane restrictions are possible on SR 163, between SR 269 to Tower Street in Marblehead for resurfacing. All work is weather permitting.
20. Various Routes: Guardrail Maintenance
District Wide (496-11): Through December, nightly from 8pm to 6am, intermittent lane restrictions are possible district wide for guardrail maintenance. Project complete: December. All work is weather permitting.
21. Various Routes: Electrical Maintenance
District Wide (572-11): Through December, nightly from 8pm to 6am, intermittent lane restrictions are possible district wide for electrical maintenance. Project complete: December. All work is weather permitting.
22. Various Routes: Sign Replacement
District Wide (511-11): Through December, intermittent lane and shoulder restrictions are possible district wide for sign replacement. Fridays during the month of May, from 9am through 2pm, intermittent lane restrictions are possible on I-475, between US 24 and I-75 in Wood county. Project complete: December. All work is weather permitting.
23. Various Routes: Pavement Marking
District Wide (640-11): Through July, intermittent lane restrictions are possible district wide for pavement marking. This week, restrictions are to be expected in Seneca County. Project complete: July. All work is weather permitting.
Up-to-the-minute road conditions are always available by logging onto www.BuckeyeTraffic.org.
![]() |
All content © Copyright 2000 - 2012 WorldNow and WTVG. All Rights Reserved.For more information on this site, please read our Privacy Policy and Terms of Service. |